UI E2E sharding in workflows

  • Status: Accepted
  • Date: 2026-01-23
  • Context:
    • What problem are we solving?
      • UI E2E runs are long and delay feedback, especially when other jobs have already passed.
    • What constraints or forces shape the decision?
      • Keep Playwright invoked through just ui-e2e and avoid new dependencies.
  • Decision:
    • Summary of the choice made.
      • Add Playwright sharding support to just ui-e2e and shard the UI E2E jobs with a matrix in CI/PR workflows.
    • Alternatives considered.
      • Increase test workers only (limited benefit because suite already uses Playwright workers).
      • Split tests by directory into separate workflows (more maintenance).
  • Consequences:
    • Positive outcomes.
      • Reduced wall-clock time for UI E2E runs via parallel shards.
    • Risks or trade-offs.
      • Increased parallel runner usage for sharded jobs.
  • Follow-up:
    • Implementation tasks.
      • Monitor shard duration balance and tune shard counts if needed.
    • Review checkpoints.
      • Reassess sharding if runner usage limits become a concern.

Task record

  • Motivation: Parallelize UI E2E to shorten CI runtime while keeping the just-based workflow contract intact.
  • Design notes: Use Playwright’s --shard flag driven by PLAYWRIGHT_SHARD_INDEX and PLAYWRIGHT_SHARD_TOTAL.
  • Test coverage summary: just ci and just ui-e2e passed.
  • Observability updates: None (workflow-only change).
  • Risk & rollback plan: Revert sharding env and matrix changes if shard stability or runner usage is problematic.
  • Dependency rationale: No new dependencies introduced.