ADR and task-record status semantics

  • Status: Accepted
  • Date: 2026-08-13
  • Operator approval: Option B approved wholesale by the operator on 2026-08-15: “I approve the ADRs as they are now and I’m resuming your goal.”
  • Context:
    • AGENTS.md requires every task to persist a task record as an ADR.
    • Architectural decisions require explicit operator approval, while routine corrective tasks still need durable records without manufacturing an architectural approval event.
    • Several completed nonarchitectural records used Accepted with Operator approval: Not required, making the status vocabulary ambiguous.
  • Decision:
    • Select Option B: introduce the nonarchitectural Recorded status.
    • Reserve Accepted for architectural decisions with explicit, decision-specific operator approval and dated evidence.
    • Permit completed nonarchitectural corrective task records to use Recorded with Operator approval: Not applicable: nonarchitectural task record.
    • Reclassify affected nonarchitectural records as they enter the replayed stack and audit the final catalogue for consistency.
  • Consequences:
    • Architectural authority remains explicit and cannot be inferred from task completion.
    • Routine corrective evidence can describe its completed lifecycle without creating an operator approval bottleneck.
    • Root policy, the ADR template, and existing records must remain aligned with the approved vocabulary.
  • Follow-up:
    • Reclassify ADR454, ADR458, ADR459, and other completed nonarchitectural task records during stack replay.
    • Add a final catalogue audit for status and operator-approval field consistency.
    • Do not change production behavior as part of status-only corrections.

Implementation Boundary

  • This approval authorizes the Recorded vocabulary, the root policy and template updates, and status-only reclassification of nonarchitectural task records.
  • It does not authorize classifying an architectural decision as nonarchitectural or marking an unimplemented task complete.

Task Record

  • Motivation:
    • Remove ambiguity between architectural acceptance and completed corrective task evidence.
  • Design notes:
    • The vocabulary separates decision authority from task completion while retaining one durable ADR catalogue.
  • Test coverage summary:
    • Validate the documentation build, catalogue links, and final status/approval-field audit.
  • Observability updates:
    • None.
  • Status-doc validation:
    • docs/adr/index.md and docs/SUMMARY.md expose this accepted decision.
  • Risk & rollback plan:
    • The risk is misclassifying architecture as routine work. Roll back status-only edits and restore Proposed if classification is uncertain.
  • Dependency rationale:
    • No dependency is added.
  • Stale-policy check:
    • Reviewed AGENTS.md, docs/adr/template.md, and the affected ADR status fields.
    • Drift was found in the former use of Accepted for nonarchitectural task records and is corrected by the approved vocabulary.